【英文课纲】20-new PFMEA Advanced Application Course Outline_En_Rev_20220315
【英文课纲】20-new PFMEA Advanced Application Course Outline_En_Rev_20220315详细内容
【英文课纲】20-new PFMEA Advanced Application Course Outline_En_Rev_20220315
Training purpose:
1 According to the latest FMEA requirements issued by AIAG-VDA, combined
with rich practical application cases (production process actually in the
charge of trainees), explain the content, requirements, internal logic,
implementation steps and methods of FMEA.
2 It includes AIAG-VDA FMEA form, internal logic and filling
requirements, structure analysis, function analysis, correlation between
FMEA of different quality processes, previous failure mode investigation
and transfer and implementation of special characteristics in FMEA.
3 Teach how to use FMEA as a quality tool in the process of new product
process development; And the ideas, steps, skills, verification and
application methods of potential failure prevention in the aspects of
continuous improvement of key process engineering of existing products.
4 Master the strategies of enterprises to promote FMEA, share best
practices, learn how to apply FMEA for knowledge management, and form
enterprise technology precipitation and long-term technical
competitiveness.
Training characteristics
(1) Emphasis on practical application: it is promised to directly use the
part product / Process Engineering (the production process actually in the
charge of the trainees) for classroom FMEA practice and comment analysis,
which can ensure that the trainees have the practical ability to
independently write and develop their own high-quality FMEA after 2 days of
training.
(2) Advisory Teaching: it will be given by the consultant of the
international top R&D center who has rich experience in the practical
implementation and application of FMEA for vehicle and parts development,
and answer questions and doubts in an open manner, so as to know and say
everything about any relevant FMEA problems.
(3) Highly targeted: systematically analyze the key problems existing in
the implementation of FMEA, and put forward solutions and advice.
(4) The content is novel: explain the latest AIAG-VDA FMEA improvement
contents, such as SOD score, AP strategy and a variety of practical tools,
methods and tables, which greatly improve the practical application level
of engineers' FMEA.
(5) FMEA awareness and culture run through: share the consultant's long-
term best practice experience in implementing FMEA in the enterprise,
integrate failure prevention into the engineer's awareness and daily
habits, integrate it into the product development process, and rise to
enterprise behavior for comprehensive failure prevention and knowledge
management.
Implementation status of FMEA for failure prevention in Chinese Enterprises
″ Almost every quality consulting company will help customers with FMEA
(potential failure mode and impact analysis) training programs. However,
only a few cases have a happy ending. Even if the case is successfully
closed, after being trained, more than half of the enterprises found that
FMEA was like "chicken ribs" after doing it for a period of time!
″ Almost every automobile industry or company involved in the automobile
industry, whether vehicle manufacturers or parts suppliers, will require or
be required to do FMEA (potential failure mode and impact analysis).
However, few enterprises really benefit from it!
″ According to the statistics of the "comprehensive survey on the
application of quality tools", 89.4% of Chinese enterprises have not
achieved good results in promoting FMEA!
″ Therefore, so far, how to effectively prevent the failure of product
design and manufacturing rather than "fire fighting" afterwards is still
one of the most headache problems for enterprises.
In fact, there are two identification criteria for whether the enterprise
FMEA has been successfully imported:
λ Does FMEA help enterprises effectively prevent the failure of product
design and manufacturing- Failure prevention!
λ Does FMEA help enterprises carry out knowledge management to form
technology precipitation and long-term technical competitiveness- Knowledge
management!
To sum up, there are two root causes of PFMEA failure:
1、FMEA is not closely combined with the enterprise's product development
and manufacturing process, and the PFMEA that should have been prevented in
advance has become a "paper article" for post exercise.
Typical symptoms: system "idling", FMEA "idling", problem "lighting"
The annual review of the enterprise quality system has been carried out
every year. But the product quality problems of the enterprise still recur
and suffer. PFMEA has been done for 4 ~ 5 years, and hundreds of copies are
like waste paper. Failure prevention still depends on "natural brute force"
without rules and regulations.
2、Engineers do not really understand what PFMEA is and do not master the
method of developing high-quality FMEA.
Typical symptom: after FMEA is finished, the engineer doesn't want to see
it for the second time.
Because they did not understand the internal logical relationship of FMEA,
blindly copied the FMEA manual template form, lacked the ideas and methods
of PFMEA development, and simply relied on brainstorming to "crawl", the
failure mode, consequences and causes were confused. In addition, the risk
score was ambiguous. Such FMEA did not even want to see it for the second
time. How can they hope for failure prevention?
Our FMEA consultant is an experienced person in the implementation of
failure prevention FMEA in Chinese enterprises. We deeply understand and
understand the difficulties and expectations of Chinese enterprises in
implementing PFMEA. We refine and summarize the advanced application of
FMEA in manufacturing department for manufacturing process engineers based
on many years of experience in enterprise consulting services.
We adopt a highly interactive practical training method, and directly use
the parts products designed by the trainees themselves (the production
process actually in charge of the trainees) for classroom FMEA practice and
comment analysis, so as to ensure that the trainees have the practical
ability to independently write and develop their own high-quality FMEAs
through the training.
AIAG-VDA FMEA Main Update
PFMEA VBA软件模板应用示例PFMEA VBA Software Application
Training Schedule(Day 1)
|Day |Topics |Details |Star|End |Dur |
| | | |t | |atio|
| | | | | |n |
| | |FMEA type, what is the use, when to use, how to | | | |
| | |use? | | | |
| | |PFMEA application [Why do, what to do, when to do | | | |
| | |it, who do, for whom do] | | | |
| |Coffee Break |10:3|10:4|0:10|
| | |0 |0 | |
| |PFMEA 1st Step:|PFMEA Overall analysis step |10:4|12:0|1:20|
| |Planning & | |0 |0 | |
| |Preparation | | | | |
| | |PFMEA Overall development combined with client’s | | | |
| | |true real products/parts (such as: household | | | |
| | |electrical appliances / packaging materials supply| | | |
| | |chain management and key components) the PFMEA | | | |
| | |practice project start | | | |
| | |PFMEA Headinfo filling requirements[FMEA | | | |
| | |date,Keydate…etc.] | | | |
| | |PFMEA team discuss method [PFMEA team building] | | | |
| | |(new version emphasis added) | | | |
| | |The past failure mode research and transfor into | | | |
| | |new projects PFMEA for failure prevention. | | | |
| |Lunch Break |12:0|13:0|1:00|
| | |0 |0 | |
| |PFMEA 2nd Step:|PFMEA Template application |13:0|13:3|0:30|
| |Structure | |0 |0 | |
| |Analysis | | | | |
| | |Team exercise and Reviews (1): Use the PFMEA | | | |
| | |function software template to start PFMEA practice| | | |
| | |with your business products / parts (such as: | | | |
| | |household electrical appliances / packaging | | | |
| | |materials supply chain management and key parts | | | |
| | |manufacturing) - Complete DFMEA Head Infor, Team, | | | |
| | |Research failure mode on past programs | | | |
| | |PFMEA analysis scope definition-Process Flow |13:3|14:3|1:00|
| | | |0 |0 | |
| | |Choose the right Process Flow for your own | | | |
| | |business | | | |
| | |Team exercise and Reviews (2):Continue PFMEA | | | |
| | |exercises.Complete PFMEA Process Flow of your real| | | |
| | |products/parts (Select one key product/part or | | | |
| | |process in your charge business), to determine the| | | |
| | |scope of analysis boundary | | | |
| |Coffee Break |14:3|14:5|0:10|
| | |0 |0 | |
| |PFMEA 3rd Step:|Identification process functional requirements - |14:5|16:0|1:10|
| |Function |process functionality matrix |0 |0 | |
| |Analysis | | | | |
| | |Team exercise and Reviews (3):Continue PFMEA | | | |
| | |exercises.Complete PFMEA Process-Function Matrix | | | |
| | |of your real products/parts (Select one key | | | |
| | |product/part or process in your charge business), | | | |
| | |and transfer to FMEA worksheet process / function | | | |
Training Schedule(Day 2)
|Day |Topics |Details |Start|End |Dur |
| | | | | |atio|
| | | | | |n |
| | |Research failure mode on past programs | | | |
| | |PFMEA analysis scope definition-Process Flow |9:30 |10:30|1:00|
| | |Identification process functional requirements | | | |
| | |- process functionality matrix | | | |
| | |PFMEA worksheet internal logic relations | | | |
| |Coffee Break |10:30|10:40|0:10|
| |PFMEA 4 Step: |Failure Mode and Effects Analysis skills |10:40|12:00|1:20|
| |Failure Analysis| | | | |
| | |The differences scoring criteria of Severity(S)| | | |
| | |in FMEA 4&5 | | | |
| | |PFMEAFailure cause / mechanism analysis skills | | | |
| | |The differences scoring criteria of | | | |
| | |frequency(O) in FMEA 4&5 | | | |
| |Lunch Break |12:00|13:00|1:00|
| |PFMEA 5~6 Steps:|Analytical skills of the current process |13:00|14:30|1:30|
| | |controls | | | |
| |Risk Analysis | | | | |
| |~ Optimization | | | | |
| | |The differences scoring criteria of | | | |
| | |detectivity(D) in FMEA 4&5 | | | |
| | |AP priority policy for Improve measures taken | | | |
| | |[FMEA 5th ] | | | |
| | |Team exercise and Reviews (4):Continue PFMEA | | | |
| | |exercises.Complete failure analysis of failure | | | |
| | |modes of products/parts ( Select one key | | | |
| | |product/part or process) | | | |
| |Coffee Break |14:30|14:40|0:10|
| |PFMEA 7th Step: |Team practice review and BP sharing |14:40|16:00|1:20|
| |Results | | | | |
| |Documentation | | | | |
| | |PFMEA with SOP/WI | | | |
| | |PFMEA with Control Plan | | | |
| | |Product Lifecycle Quality Strategy | | | |
| | |The key to FMEA success | | | |
| | |Q&A | | | |
Prerequisites
■ Basic process/ technical experience.
.
Course Methodology
• Breakout Exercises
– The exercies will be conducted during each training stage to
pratice FMEA, and also to evaluate the understanding of the
training courses.
– The purpose of breakout exercises is to develop skills of dfmea
Application by having individuals or teams working on practical
situations
• Evaluation of Individual Participation
– Attendees will be evaluated on class participation, which
encompasses the following aspects:
• Asking meaningful questions in class
• Sharing professional experiences
• Taking an active role in team exercises
– Effective class participation provides the attendee with
opportunities to demonstrate practical understanding of FMEA
• Certificate
– Certificate will be issued after satisfied participatings,
training performance evaluation.
The course has been trained for the following well-known enterprises and
has been highly recognized:
-----------------------
Base on AIAG-
VDA FMEA Edition版!
Advanced PFMEA Application for Manufacturing
(AIAG-VDA New Edition PFMEA)
(2 Days Workshop )
2 Days Workshop
Your Trustable FMEA Professionals!
FMEA is only paper work?
“FMEA is just Paper Work, we can not see any use for quality improvement
except for showing auditors”
“We have more than hundreds of FMEA sheets, but same problems occur again
and again!”
“We have been trained numerous times for FMEA, but our engineers still
looks at FMEA as extra burden, what’s problem?”
“I’ve heard many top companies regard FMEA as top secret. But our FMEA is
cooked up by our engieers, we can not see why should it be secret? How to
manage and accumulate our knowledge with FMEA?”
“The field problems are most due to design reason. We are always fire
fighter, but fire comes out any time anywhere. If we can correct happened
problems, how could we prevent potential failures?”
“How to integrate FMEA with design process and kill the failure in the
early stage, and implement FMEA as tools intead of burdens.”
“Our engineers actually want to develop FMEA, but always alone without any
support. How to transfer FMEA job to Team Work?”
“How to build up the FMEA culture, and build FMEA methodology into the
working habit of each engineers?”
……
What are the benefits?
Emphasize practical application
Using customer on-site product for FMEA teaching, ensure every participant
fully understand how to develop high value-added FMEA
Rich experience of consultant
The professional consultant have rich FMEA experience in
vehicle/system/subsystem of GM, Samsung and Philips
Target at key issues
Using customer’s current FMEA files for problem analysis, and develop the
improvement planning combined with customer design process
Innovative Content
Most illustrative explanation from FMEA professionals, which are the key
writing committee of AIAG-VDA new FMEA manual
FMEA is process
Easy operational VBA-FMEA template for engineers application in their daily
work.
Who should attend?
Design Engineer,Procss Engineer, Industry Engineer,
QA/QC, SQE,Design Engineer
Process/ Design/Quality Strategy Management
Production/Design/Tech. Director or Manager
Product Manager, Project Manager
Tips
✓ Directly use Your Product to conduct FMEA practices in the workshop!
✓ This course target at FMEA impovement and application for engineers to
add value to FMEA process.
✓ Note: On-site training with FMEA project consulting!
If you are experiencing above pains, please contact us righ away!We will
help:
FMEA breakthrough solution!
FMEA dramatical Improvement!
刘泽锋老师的其它课程
试验设计(DOE)高级应用DesignofExperiment(DOE)AdvancedApplication【2DaysWorkshop】[pic]课程介绍:2天课程按照:关键影响因子查找→控制因子试验优化的完整逻辑思路,结合学员真实产品及工程方案,深入浅出地讲授DOE(DesignofExperiment)-试验设计在企业产品开发过程中的实际应用方法和技
讲师:刘泽锋详情
AIAG-VDA新版FMEA失效模式与影响分析高级应用(POTENTIALFAILUREMODEANDEFFECTSANALYSIS)基于AIAG-VDA最新FMEA(3天课程)[pic]培训目的: 1.全面掌握AIAG-VDA最新发布FMEA要求及更新内容:包括最新的SOD评分方法AP、多种可FMEA表格模版、RPN/AP及最新推荐的DRBFM在设计变更
讲师:刘泽锋详情
课程WORKSHOP背景: 2天课程,以全新角度讲授:TRIZ核心工具方法包括S进化曲线的现实意义,技术矛盾与物理矛盾的区分与关联及其对应的TRIZ创新解决方法,矛盾矩阵表与分离法则,39个工程参数与40条创新法则等通过众多的案例小组实操练习完美应用到实际问题解决中去,帮助学员快速掌握创新方法和技巧,激发个人创新潜能,提升创造性问题解决能力。同时还会讲授与T
讲师:刘泽锋详情
田口参数设计(田口DOE)高级应用TaguchiParameterDesignAdvancedApplicationforRD(2DaysWORKSHOP)[pic]课程介绍:2天课程,结合实际产品讲授田口参数设计在产品开发过程中的实际应用方法。通过选择设计参数,确定试验方案,以信噪比(S/Nratio)为指标,实现减少噪声因子(不可控因子)对目标值的影响最
讲师:刘泽锋详情
研发质量功能展开(QFD)高级应用QualityFunctionDeployment(QFD)AdvancedApplicationforRD(2天课程WORKSHOP)[pic]课程WORKSHOP背景: 2天课程 本课程以全新角度探讨产品设计过程中如何应用QFD透彻理解并转换顾客需求/要求变成产品设计指标,并分解落实到详细零部件结合到产品设计之中;全
讲师:刘泽锋详情
8D问题解决高级应用(8D与六西格玛、TRIZ工具集成)Advanced8DisciplinesApplicationforProblemSolving(Synergy8DandSix-Sigma,TRIZIntegrationApplication)(2DaysWorkshop)[pic]课程特色:以全新的角度透彻讲授:•如何将8D与六西格玛、TRIZ工具
讲师:刘泽锋详情
六西格玛(DMAIC)管理层培训SixSigma(DMAIC)ExecutiveTraining(2天)课程WORKSHOP特色[pic]课程WORKSHOP背景: 为什么要六西格玛导入Workshop:帮助企业从上到下(TOP-DOWN)理解和掌握六西格玛的核心内容以及如何在企业中实施创造最大价值,理解实施六西格玛突破性策略的方法和过程以及企业实施六西
讲师:刘泽锋详情
-1016000215900Minitab数据分析高级应用(2DaysWorkshop)Minitab数据分析高级应用(2DaysWorkshop)374459544450-1174750-158750-920750-717550Minitab数据分析高级应用Minitab数据分析高级应用如果您想快速地提高自己用数据说话的超强表达能力;如果您面对大量数据不知
讲师:刘泽锋详情
研发DFSS创新稳健设计高级应用DesignforSixSigmaforRD(10天课程)[pic]课程WORKSHOP背景: DFSS-DesignforSixSigma(六西格玛设计)-是目前世界上许多跨国公司研发中心在进行工业产品设计时广泛应用的一套先进研发质量工具和方法。这门课程是根据国外顶尖研发中心设计工程师在进行工业产品研发设计时成功应用DF
讲师:刘泽锋详情
- [潘文富] 中小企业招聘广告的内容完
- [潘文富] 优化考核方式,减少员工抵
- [潘文富] 厂家心目中的理想化经销商
- [潘文富] 经销商的产品驱动与管理驱
- [潘文富] 消费行为的背后
- [王晓楠] 辅警转正方式,定向招录成为
- [王晓楠] 西安老师招聘要求,西安各区
- [王晓楠] 西安中小学教师薪资福利待遇
- [王晓楠] 什么是备案制教师?备案制教
- [王晓楠] 2024年陕西省及西安市最
- 1社会保障基础知识(ppt) 21153
- 2安全生产事故案例分析(ppt) 20216
- 3行政专员岗位职责 19038
- 4品管部岗位职责与任职要求 16213
- 5员工守则 15453
- 6软件验收报告 15390
- 7问卷调查表(范例) 15105
- 8工资发放明细表 14545
- 9文件签收单 14189